Showing posts with label #omg. Show all posts

September One Monthly Goal

New month, new goal.

New to One Monthly Goal?  Welcome!  To join, share a photo of your project plus some words about what you want to accomplish in a blog post or Instagram post and add that photo to the link up.  Return at the end of the month and share your results.  (Results link up opens for the last 7 days of the month.)

My goal this month is to quilt my Range quilt. I debated quilting each "range" separately, but in the end I decided a simple texture would be more to my taste. I am kind of considering switching thread colors as I go along. However, my backing is mostly white and that may pose a bit of a challenge. We'll see how it goes. 

Bonus points if I can at least get the binding on one side this month as well. My kit had the royal blue for binding, but I think I'd rather go a shade or two lighter. I'll have to see what I have. I will hand-stitch it down, but that may not happen this month. 

Now it's your turn to link up. The link up will remain open through September 7.

The One Monthly Goal accomplishment link up will be available on September 24.  Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just copy and paste this link into your post:  

Stories from the Sewing Room One Monthly Goal September Link Up

Take a few minutes to visit others, offer encouragement, and make new friends!

You are invited to the Inlinkz link party!

Click here to enter

August One Monthly Goal Finish Link Up

How did you do with your goal this month?

This link up will remain open until August 31 at 11:55 pm EST.

Want to see everyone's goals? Check out the August goal page

My goal this month was to make a purple whole cloth bedspread/quilt for my daughter. As of the 19th, I hadn't even started yet. Also on the 19th, a positive Covid test. I've never had it before. 😫 I figured there was no hope at all for completing this project.

By Saturday I was so bored I decided to tackle ironing the 20 yards of washed fabric. I used Confetti Cottons in Unicorn and Iris. I'm glad I washed this because after washing the fabric was 42" wide from selvedge edge to edge for the Unicorn and 41" wide for the Iris. It was 44" prior to washing. I decided to make the bedspread 90" wide and 106" long. Note I'm saying bedspread because she decided she wanted it long enough to do a pillow fold rather than separate shams. This dimension allowed for up to 3% additional shrinkage of the  Quilters Dream Cotton Deluxe batting after washing and drying the quilt. I didn't consider the shrinkage due to the quilting, but I figured 3% was generous and should cover any scenario. Her original quilt was 87" x 87" after 20 years of washing and usage. (It had shams as well.)

Okay, back to the quilting. I didn't take any pictures of actually assembling the pieces. I just cut three widths at 90" each for the top and 96" cuts for the back, seamed them at 1.5" with a 2.0 stitch length with selvedges still on, then trimmed off the excess in the seam, leaving a 1/2" allowance. I left the back as-is and trimmed the front to my target length of 106". I had 2.5 yards of the Unicorn left and 2 yards, 5" of the Iris after making the cuts, so it appears that while I lost some width, I didn't lose length after the washing.

For quilting, we decided on the Get in Loser design from Melissa Kelley. The thread is Glide Grape on the bottom and Amethyst on the top. It was a pretty long stitch-out even though I feel like I went with a standard size for the design scale. This first one is true colors.
My full quilt photo color is so far off. I couldn't adjust it to look remotely close to actual.
We debated which color binding to use. I used the darker color simply because I had a better all-purpose thread color match for it (or so I thought). After quilting, the quilt now measures 88" x 102.25". I was a bit shocked that I lost 2" of width just from quilting. I haven't completely finished yet since I was feeling tired by late Monday afternoon and I still had to make a trip into town to deliver my son's car to him. But I'll get the binding completed for sure before the end of the month and then I'll update the post with a final picture or two.

Edit: I finished this on August 26. 

Now it's your turn to share your finish (or your progress if you didn't quite make it to the finish line).

Take a few minutes to visit others, offer encouragement, and make new friends!

This link up will remain open until 11:55 pm EST on August 31. Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just paste this link into your post:  

Stories from the Sewing Room August One Monthly Goal Finish Link Up

August One Monthly Goal

 Join us in choosing a goal to work towards this month.

New to One Monthly Goal?  Welcome!  To join, share a photo of your project plus some words about what you want to accomplish in a blog post or Instagram post and add that photo to the link up.  Return at the end of the month and share your results.  (Results link up opens for the last 7 days of the month.)


My goal this month is to press 20 yards of fabric, sew them into a quilt top and quilt backing, and quilt and bind them into a new bedspread for my daughter. She's had her current one (a Pottery Barn kids pink quilt) for over 20 years! It's been in at least five houses throughout her childhood. Anyway, I thought it was time to replace that one since it's worn and stained. She wanted purple. I've moved it a bit more towards lavender since it's in my house and she is not. The walls are light blue and I'm not planning to repaint them.

This goal might be a bit aggressive. August will probably be emotionally tough for me since our son will be leaving for college. Maybe it will be good to have a challenging project to work on. I don't know. If I can get this done, it will remove two bolts of fabric (which are fluffy and big since I've already washed them) from my sewing closet. That would be great! I need more room in there.

Now it's your turn to link up. The link up will remain open through August 7.

The One Monthly Goal accomplishment link up will be available on August 25.  Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just copy and paste this link into your post:  

Stories from the Sewing Room One Monthly Goal August Link Up

Take a few minutes to visit others, offer encouragement, and make new friends!

You are invited to the Inlinkz link party!

Click here to enter

July One Monthly Goal Finish Link Up

It's time to share your July progress.

This link up will remain open until July 31 at 11:55 pm EST.


Want to see everyone's goals? Check out the July goal page

My goal this month was to bind my Linda J. Hahn Beach Bumz quilt. Ta-da.
I added hanging tabs to the back.

I custom-quilted this quilt, which measures 32.25" square. I used Glide Tar Heel, Blizzard, Air Force Blue, Limerick, and Bright White threads. I used a combo of freehand and computerized designs. The batting is a Quilters Dream poly Frankenbatting.

I also accomplished one of my secondary goals, which was to bind the Charm Squares dinosaur baby quilt.
Now it's your turn to share your finish (or your progress if you didn't quite make it to the finish line).

Take a few minutes to visit others, offer encouragement, and make new friends!

This link up will remain open until 11:55 pm EST on July 31. Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just paste this link into your post:  

Stories from the Sewing Room July One Monthly Goal Finish Link Up

You are invited to the Inlinkz link party!

Click here to enter

July One Monthly Goal

Join us in choosing a goal to work towards this month.

New to One Monthly Goal?  Welcome!  To join, share a photo of your project plus some words about what you want to accomplish in a blog post or Instagram post and add that photo to the link up.  Return at the end of the month and share your results.  (Results link up opens for the last 7 days of the month.)

My goal this month is to bind my Beach Bumz quilt. 

My secondary goals are to bind my dino quilt, sew my Athena bag, and perhaps sew an article of clothing or quilt my purple whole cloth bed quilt (this requires pressing 20 yards of washed fabric though 😳).

Now it's your turn to link up. The link up will remain open through July 7.

The One Monthly Goal accomplishment link up will be available on July 25.  Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just copy and paste this link into your post:  

Stories from the Sewing Room One Monthly Goal July Link Up

Take a few minutes to visit others, offer encouragement, and make new friends!

You are invited to the Inlinkz link party!

Click here to enter

June One Monthly Goal Finish Link Up

Did you make progress on your June goal?

This link up will remain open until June 30 at 11:55 pm EST.

Want to see everyone's goals? Check out the June goal page

My goal this month was to custom quilt my Linda J. Hahn Beach Bumz quilt. I made a Frankenbatting and picked a backing from my stash early in the month. 
I had a rough plan sketched out for the quilting.
After four hours and 20 minutes of quilting, I thought I was done. I had a few issues during quilting. I hate quilting with my ruler base on this machine. I cannot for the life of me figure out why I can't stitch at angles when it is installed. I needed some ruler work, so I went rogue and used the ruler without the base. It worked, but the lines weren't especially smooth. It's not the safest thing to do either.

Since I was having issues with the rulers, I programmed in a cross hatch in my Intelliquilter for those light blue areas. I didn't realize how tiny/dense it was until the first one had stitched out. I was aiming for 1/2" grid and ended up closer to 1/4". I was not ripping that out, so I just went with it. This was probably not the best choice.

After leaving the quilt hanging over the frame for several hours, the larger un-quilted area in the center and also the green border were really droopy. I'd done a good amount of stitch in the ditch, so I was pretty surprised. 
Another couple hours and I now have this.
I wasn't happy with the big loops I stitched in the outside border and now the density is all over the place. I think I need to rip it out and put something a little more dense in that outer border to help the quilt lay flatter. Maybe I need to add more stitching to the white parts of the star blocks too? And then what about all the spiky white parts? Ugh. 

My June goal is technically complete since the entire thing is quilted. I'm just not totally happy with it.

Now it's your turn to share your finish (or your progress if you didn't quite make it to the finish line).

Take a few minutes to visit others, offer encouragement, and make new friends!

This link up will remain open until 11:55 pm EST on June 30. Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just paste this link into your post:  

Stories from the Sewing Room June One Monthly Goal Finish Link Up

You are invited to the Inlinkz link party!

Click here to enter

May One Monthly Goal Finish Link Up

 How did you do with your May goal?

This link up will remain open until May 31 at 11:55 pm EST.

Want to see everyone's goals? Check out the May goal page

My goal this month was to get my Magnificent Mystery quilt pieces sewn into a top. Here's how it looked at the beginning of the month. The half blocks were sewn and the rest needed to have the rows sewn into blocks.
Last week I had finally finished the pink and blue blocks. I think I sewed every intersection at least five times. 😟 

Saturday it was raining again and I thought I'd spend some time trying to get the green and blue blocks sewn. It took me around two and a half hours to get the seams aligned correctly and sewn on the 13 blocks. From there I thought I'd at least sew the half-block rows together before dinner. I almost wept with joy that there was nothing to really align. I could just sew, so I kept going. I got all but two seams sewn before dinner. I think it took about half an hour.

I finished up the last two seams yesterday! I really didn't think I'd be able to finish this goal this month, but, much to my surprise, I did. I am so glad this project is done. I like my fabrics, I like the quilt design, but I did not enjoy sewing this one. 
I'll need to figure out how I'm going to quilt it. It's definitely getting an edge-to-edge. But that's a goal for a different month. 🙂

Now it's your turn to share your finish (or your progress if you didn't quite make it to the finish line).

Take a few minutes to visit others, offer encouragement, and make new friends!

This link up will remain open until 11:55 pm EST on May 31. Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just paste this link into your post:  

Stories from the Sewing Room May One Monthly Goal Finish Link Up

You are invited to the Inlinkz link party!

Click here to enter

May One Monthly Goal

It's time to choose a goal for May.
New to One Monthly Goal?  Welcome!  To join, share a photo of your project plus some words about what you want to accomplish in a blog post or Instagram post and add that photo to the link up.  Return at the end of the month and share your results.  (Results link up opens for the last 7 days of the month.)

Since I didn't finish my goal last month of completing my Magnificent Mystery quilt top, I'm going to try again. I have the half blocks finished. I need to join the rows for the remaining 25 blocks. And then join all the blocks into the quilt top.

Now it's your turn to link up. The link up will remain open through May 7.

The One Monthly Goal accomplishment link up will be available on May 25.  Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just copy and paste this link into your post:  

Stories from the Sewing Room One Monthly Goal May Link Up

Take a few minutes to visit others, offer encouragement, and make new friends!

You are invited to the Inlinkz link party!

Click here to enter

April One Monthly Goal Finish Link Up

It's time once again to share your monthly progress.

This link up will remain open until April 30 at 11:55 pm EST.

Want to see everyone's goals? Check out the April goal page

My goal this month was to get my Magnificent Mystery quilt pieces sewn into a top. Here's how it looked at the beginning of the month. 

And here's how it looks now. I completed all the partial blocks and made some good progress on the piecing, but it's not done. 🫤 The pink and blue blocks just need the rows joined. The green and blue blocks need one more unit sewn to each row before I can join the rows together. 

Now it's your turn to share your finish (or your progress if you didn't quite make it to the finish line).

Take a few minutes to visit others, offer encouragement, and make new friends!

This link up will remain open until 11:55 pm EST on April 30. Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just paste this link into your post:  

Stories from the Sewing Room April One Monthly Goal Finish Link Up

You are invited to the Inlinkz link party!

Click here to enter

April One Monthly Goal

What will be your focus project this month?

New to One Monthly Goal?  Welcome!  To join, share a photo of your project plus some words about what you want to accomplish in a blog post or Instagram post and add that photo to the link up.  Return at the end of the month and share your results.  (Results link up opens for the last 7 days of the month.)

Looking over my list of projects, I think my main goal this month needs to be assembly of the Magnificent Mystery quilt top. Bonus if I can get it quilted. I have backing and binding. 

Other things I'm hoping to work on this month include making a clothing item, making an Athena bag, working on knitting projects in the evening, and working on quilting one of the five tops I have that need to be quilted. This is probably more of a wish list than a reality. 😅

I have a lot of bindings to do on the work side, so even getting my quilt top made is going to be a stretch.

Now it's your turn to link up. The link up will remain open through April 7.

The One Monthly Goal accomplishment link up will be available on April 24.  Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just copy and paste this link into your post:  

Stories from the Sewing Room One Monthly Goal April Link Up

Take a few minutes to visit others, offer encouragement, and make new friends!

You are invited to the Inlinkz link party!

Click here to enter

March One Monthly Goal Finish Link Up

We've made it through another month and it's time to share our progress.

This link up will remain open until March 31 at 11:55 pm EST.

Want to see everyone's goals? Check out the March goal page

My list of goals were to bind Nancy's quilt, complete the Linda J. Hahn class quilt, and assemble & finish the Magnificent Mystery. I did finish off Nancy's quilt. I did not work on the Magnificent Mystery quilt at all, but I did quilt and bind the History Center quilt. 

My official goal was to get the Linda J. Hahn top assembled. It once again came down to the wire, but I did eventually get there. I had many hiccups along the way. The star blocks were a total challenge to fit together. I ripped and resewed many, many times. 

Then I went to sew the spire units to the stars and WHAT?! They don't fit. I figured out that I had cut the center strips 1/2" too large, so I had to disassemble one row of spires on each, trim off the excess, and resew everything. 

I got the center unit completed.

Here I am auditioning the skinny and outer borders. The instructions call for 1.5" finished and 3.5" finished, but I went with 1" finished for the skinny border because I thought the other was too heavy. 
Here is my finished top. I'll probably do some light custom quilting on this one. It's around 33" square. 
Now it's your turn to share your finish (or your progress if you didn't quite make it to the finish line).

Take a few minutes to visit others, offer encouragement, and make new friends!

This link up will remain open until 11:55 pm EST on March 31. Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just paste this link into your post:  

Stories from the Sewing Room March One Monthly Goal Finish Link Up

March One Monthly Goal

It's time to choose a goal for the month. What will you focus on?
New to One Monthly Goal?  Welcome!  To join, share a photo of your project plus some words about what you want to accomplish in a blog post or Instagram post and add that photo to the link up.  Return at the end of the month and share your results.  (Results link up opens for the last 7 days of the month.)

My priorities for this month are: 

Bind Nancy's quilt.

Assemble Linda J. Hahn quilt, quilt, bind.

Assemble Magnificent Mystery quilt, quilt, bind.

While I'm hoping to make progress on all three, my goal this month will be to get the Linda J. Hahn quilt sewn into at least a quilt top. 

Now it's your turn to link up. The link up will remain open through March 7.

The One Monthly Goal accomplishment link up will be available on March 25.  Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just copy and paste this link into your post:  

Stories from the Sewing Room One Monthly Goal March Link Up

Take a few minutes to visit others, offer encouragement, and make new friends!

You are invited to the Inlinkz link party!

Click here to enter

February One Monthly Goal

It's time to focus on a goal for the month.
New to One Monthly Goal?  Welcome!  To join, share a photo of your project plus some words about what you want to accomplish in a blog post or Instagram post and add that photo to the link up.  Return at the end of the month and share your results.  (Results link up opens for the last 7 days of the month.)

I am considering four projects for my goal this month. 

I can work on Nancy's quilt. (Cupcake Crossing from the Sew Sampler box)

I can assemble my Magnificent Mystery top (final clue will be out Thursday the 5th).

I can work on my Linda Hahn mini quilt. I can't figure out how to foundation piece the four remaining blocks.
Or I can create my dinosaur quilt. The pattern I actually purchased the fabric for, including backing and binding, didn't work out due to the large amount of background color included in each charm pack and I had to find an alternate pattern that might work with the fabrics I have. I found a charm square pattern from Elizabeth Hartman that I think will work. I might end up needing the backing on the front, which creates another issue. 
The most practical of these projects to work on are either Nancy's or the Linda Hahn since they are closest to completion. But I'm stuck on the piecing for the Linda Hahn, so I guess I will select Nancy's quilt. My goal is to get Nancy's quilt into a top this month. 


Now it's your turn to link up. The link up will remain open through February 7.

The One Monthly Goal accomplishment link up will be available on February 22.  Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just copy and paste this link into your post:  

Stories from the Sewing Room One Monthly Goal February Link Up

Take a few minutes to visit others, offer encouragement, and make new friends!

You are invited to the Inlinkz link party!

Click here to enter

January One Monthly Goal Finish Link Up

It's time to share this month's progress.


This link up will remain open until January 31 at 11:55 pm EST.

Want to see everyone's goals? Check out the January goal page

My goal this month was to get caught up on the Magnificent Mystery quilt. At the beginning of the month I still needed to sew steps 3, 5, 6, and 7. 
beginning of January

I've been slowly chipping away at the clues. 

Step 6/December's clue took me quite some time. I had to create 120 HST and sew them into blocks. Friday I cut apart and pressed the HST. Yesterday I trimmed all the HST. Last night I finished up sewing the green blocks. I'm now caught up. 
I do have some assorted background pieces left over. I guess we'll find out if I just counted wrong or there are a few more pieces needed. 

Now it's your turn to share your finish (or your progress if you didn't quite make it to the finish line).

Take a few minutes to visit others, offer encouragement, and make new friends!

This link up will remain open until 11:55 pm EST on January 31. Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just paste this link into your post:  

Stories from the Sewing Room January One Monthly Goal Finish Link Up

You are invited to the Inlinkz link party!

Click here to enter

January One Monthly Goal

Happy new year! I hope 2026 is your best year ever. Let's start the year off right by selecting a new goal to work towards.

New to One Monthly Goal?  Welcome!  To join, share a photo of your project plus some words about what you want to accomplish in a blog post or Instagram post and add that photo to the link up.  Return at the end of the month and share your results.  (Results link up opens for the last 7 days of the month.)

My goal this month is to get caught up on the current Meadow Mist mystery. I need to do steps 3, 5, and 6. Step 7 comes out today, so I'll have that to do as well. 

Now it's your turn to link up. The link up will remain open through January 7.

The One Monthly Goal accomplishment link up will be available on January 25.  Make sure you add a link to this OMG post so others can find the OMG link up from your blog--just copy and paste this link into your post:  

Stories from the Sewing Room One Monthly Goal January Link Up

Take a few minutes to visit others, offer encouragement, and make new friends!

You are invited to the Inlinkz link party!

Click here to enter